The current development of the delicatessen in the food and beverage market is very prosperous, and the market demand for food is also very large. Opening a delicatessen can be regarded as the best choice for entrepreneurs. There are many places to pay attention to when opening a delicatessen. So what are the steps for deli renovation? The following decoration home decoration network Xiaobian will bring you a detailed deli decoration process , I hope everyone can help after reading.
What are the steps for deli renovation?
1, deli decoration business negotiations: deli design process explanation; customer basic requirements discussion; the introduction of charging methods.
2. Signed a contract for the design of the deli decoration (initial discussion): Conducting the measurement and recording of the deli in the field; drawing the preliminary plan of the deli and the top plan; communicating and finalizing the preliminary plan of the deli design.
3, deli decoration complete program design (deep talk): draw a detailed design of the deli design; deli decoration design map communication and finalization; draft a deli decoration budget book.
4, deli decoration budget, material finalization (detailed): discussion of the applicability of deli decoration building materials; project budget book confirmation; deli wrote a building materials table.
5. Sign the project contract: sign the formal contract; the drawings are transferred to the engineering department for filing; and the materials are prepared.
6. Preparation for the entrance: testing the deli, testing the wall, floor, roof and drainage pipes; preparing the materials, listing the materials, coordinating with the preparation department; personnel scheduling, identifying the construction personnel, and identifying the person in charge of the construction site.
7. Start on time: start work according to the contract to determine the date; designer, construction staff, water and electricity commissioner on-site guidance.
8. Construction in progress: Material distribution site and construction in strict accordance with the drawings; designer on-site coordination, adjustment of construction workers supervision and acceptance.
9. Total acceptance of completion: Acceptance according to relevant acceptance criteria; total settlement according to actual decoration and renovation work volume,
10, after-sales service: issue decoration warranty: circuit diagram, equipment product warranty card; set up engineering decoration project archives, regular visits to customers.
The above are the steps for the deli decoration brought to you by Xiaobian? The whole contents of the deli decoration process, I believe that after reading this article, you have a basic understanding of the deli decoration process, if you want to know more about decoration consultation, please click to enter the decoration knowledge channel.
More related wonderful reading:
What are the problems with deli renovation? Delicatessen decoration precautions
How to design a deli decoration? Deli design principles
How much is the deli decoration? How to save money in deli decoration?
What are the styles of deli decoration? Deli decoration style inventory
What should I pay attention to in the deli feng shui? Delicatessen Feng Shui Precautions
Description about Disposable Protective Clothing
Professional disposable protective clothing manufacturer in china, including the protective clothing, protective caps, protective foots.The protective clothing can protect you from gas, virus, water etc. Different sizes are option, color is blue.
Material: PP+PE
Packing: 30pcs/CTN ;Packing size:58X39X33CM
Product Size: 160/165/170/175/180/185;
Weight:40-43g/㎡
Pictures of the disposable protective clothing
Disposable Protective Clothing ,Protective Suit,Protective Gown ,Medical Protective Coverall
Dongguan Smart Furniture Co.,Ltd , https://www.smtfurniture.com